< back |
Winter
2015/ Spring 2016 Some pictures |
The soldering of the overflow of the sink in the toilet room was broken and not tight. Repaired.
|
Full repainting with two components polyurethane finish coat of the cabinet under the sink. |
Full repainting of the teak toe-rail with two coats of Coelan yellowish primer and 6 coats of International Schooner Gold varnish. |
Lifting of the roof of the pilot house to take out the engine. |
A seldom view of the pilot house. |
The lifting out of the engine. |
An empty and dirty engine room. |
The engine is out. |
Removed the compressor for the diving cylinders. Will be reinstalled sometime after revision. |
Full repainting of the middle of the bilge with Veneziani Ceramite epoxy coating and with two components polyurethane varnish for the rest. |
Same on the port side. |
Same on the starboard side. |
Substitution of
the rubber lips type Vetus stuffing box with the old Vetus packing type stuffing box. Soldered a water inlet. |
Installing the revised engine. |
The revised engine is ready to run again. |
A little bit insulation on the ceiling of the pilot house. |
Substitution of the old ceiling in the pilot house with a new one. |
The new ceiling of the pilot house. |
Before the substitution of all side-walls and all windows. |
After the substitution of all side-walls and all windows. |
Substitution of the old 80 Lt Frigomar fridge with a new one from Frigonautica. |
The new Danfoss type fridge compressor. |
The connections for the through the hull condenser of the new fridge. |
Sanded the cockpit seats. |
Varnishing of the cockpit seats with one coat of Coelan Bootsgrundierung yellowish and 6 coats of Coelan Bootsbeschichtung. |
New 22" Samsung TV. |
Home Specifications Modifications Pictures Trips Logbook Links e-mail